The road left for the sewer line became a parking zone The road left for the sewer line became a parking zone

Spread the love

Bharuch33 minutes ago

  • Copy link
  • Destruction of a one-way road from Jawahar Nagar in Netrang to the railway station

The main road of Netrang Nagar is four roads connecting Jawahar Bazar, Gandhi Bazar and Jean Bazar. The road that has been in operation for the last ten to fifteen years has been damaged from Jawahar Bazar to Jalaram Mandir, causing great hardship to the people. After the new authorities took over the helm of the panchayat, for the renovation of this road, from the provision of the finance commission and the district MP allocated rupees from his own grant, the renovation of the main road CC road from Jawahar Bazar to the railway station is being carried out at a cost of rupees seven lakhs. A side road has been made CC. The operation of the road on the other side is currently closed.

Also, the work on the other side road will start during the Diwali period. At present the CC road which has been constructed. The entire road has become a parking zone leaving space for sewer lines in between. On the other side of the road, due to monsoons, mud and potholes, pedestrians and vehicle owners are facing frequent problems. As the traffic jam is also happening, there is a demand of the Panchayat authorities that the CC road should be constructed on the place left for the sewage line and the CC road should be started.

.

Leave a Reply

Your email address will not be published. Required fields are marked *