Pressure on the road during Morbi, the bulldozer of the Zilla Panchayat turned again Pressure on road during Morbi period, bulldozer of Zilla Panchayat rolled back

Spread the love

Morbi44 minutes ago

  • Copy link
  • The road connecting Shapar village had been under pressure for a long time

The roads connecting Jasmat Garh and Shapar from Tapam village of Morbi taluka have been damaged by unpaved pressures for a long time and the road building department of the district panchayat got information about it. On the basis of which, an order was given by the DDO to remove the pressure and following this order, demolition work was carried out by the system including road and building department of the district panchayat.

There were many pressures on the road connecting Jasmatgarh and Shapar village of Morbi taluka for a long time. Four houses, some walls and illegal pressures of toilets and bathrooms were demolished on the public road of this rural area. Since these pressures are standing on the road, previously the district panchayat gave a notice and instructed to remove the pressure voluntarily, but even after the notice, the pressure was not removed by the pusher.

In this regard, a report was made at the highest level by the road building department and based on this, the district development officer D D Jadeja ordered to remove these pressures along with road and building department officers Chaudhary, Ghetia and Talati and in-charge TDO Vipul Jivani of Rakhi village along with police presence. The pressure on the road was removed.

However, the pressures hindering the development works are being removed by showing a strict attitude against the pressures by the DDO. Following the order of DDO, the pressure was removed from Pipaliyaraj and Bagthala villages of Wankaner taluka, now the pressure removal work was done in Tapam village as well.

.

Leave a Reply

Your email address will not be published. Required fields are marked *